Shaft Street Pump Station
Construction and installation of a below ground concrete structure around 25 m in length, 8m in width and around 3m in depth. A deep 1.5m sump at one end of the station housed three identical stormwater pumps. The pumping station will pump potential floodwaters into the creek via a chute arrangement.
The works also involved construction of the new stormwater intake lines and modified stormwater kerb inlet pits. Supply and installation of the switchboard and pump manifold systems.